It can be nailed stapled and or glued to a solid subfloor or an existing hardwood floor in good condition.
Bamboo flooring generally needs to sit 2 3 weeks before installing.
Pro installation adds 3 to 5 per square foot.
On one hand it s a fast growing plant that s available in vast quantities so it s a rapidly.
Bamboo flooring can be installed on almost any subfloor that is clean dry and level including wood cement or one layer of another flat flooring product.
Both types are 1 2 to 5 8 inch thick and 3 1 2 to 7 1 2 inches wide with variable lengths.
Step 5 check moisture content.
But like wood bamboo can be scratched and it is prone to cracking in conditions where humidity levels swing dramatically.
Once the bamboo flooring has been laid out all over the room it should be left this way for a small period of time.
Use pieces from the various boxes to ensure an.
The subfloor must be clean dry and level.
Bamboo flooring is a natural product and needs to acclimatise.
Engineered bamboo flooring is the easiest bamboo flooring type to install and you can do it yourself.
Although engineered bamboo planks aren t waterproof they re more moisture resistant than solid bamboo planks thanks to the wear layer and the waterproofing on the bottoms of the planks.
When it comes to pros and cons of bamboo flooring there s some controversy about whether or not it s a sustainable material.
Careful preparation is needed before installing any bamboo flooring.
2 the bamboo flooring was glued down to a concrete slab but the glue wasn t troweled down properly either wrong trowel was used or there isn t full coverage on the slab and there are gaps in the glue so the moisture being released by the slab is hitting the bottom of the wood bamboo floor.
Different glues have different moisture barriers 3.
Solid bamboo hardwood flooring is installed like any hardwood flooring.
The bamboo flooring needs to acclimate to the room where you are installing it for seven days prior to installation.
After 2 to 3 weeks have passed check the moisture content of the flooring again using the.
If you have a newly laid concrete subfloor you must check for moisture using a concrete moisture meter the moisture content should be below 6.
This period depends on the moisture content of the room and can be anywhere between 2 to 3 weeks.
Installing bamboo flooring means gluing or nailing to a subfloor.
Open all the boxes of bamboo.
The bamboo flooring will be ready for installation as soon as the difference in moisture content between the flooring and subfloor is within 3.